Aside from accelerated processing time, the surface area sees a reduction by as much as 2.4 times over that of traditional windrow turning. to process the same amount of material and achieves maturation at X weeks. The same operation after conversion to a MAF composting system requires only 3450 sqm. Sit on the throne as a benevolent (or malevolent) medieval monarch of the modern age and swipe your royal fingers eit. In order to achieve the same maturity as with the MAF Composting System, the total process time on turned windrows must be at least 8 weeks. SPACEPLAN is an experimental piece of interaction based partly on a total misunderstanding of Stephen Hawkings A Bri. Thus, the windrow turning surface area requirement on this site equates to 8601 sqm. When it comes to the future of space exploration, the name of the game is save money. 5 meters between each windrow (in reality it would likely be much greater). A typical 5m wide by 2m high windrow would require 10 rows at 111m each to accommodate 6000 cubic meters of material. In this example we look at the footprint of a windrow turning operation with an input capacity of 8000 tons per annum of green waste on a 14600 sqm. Special thanks to our guests: Colette Pichon Battle and Maurice Mitchell This episode of How to Save a Planet was. ![]() ![]() The following images represent a simplified graphic example of the reduction of surface area required by a composting facility after converting from a traditional windrow turning operation to the MAF composting system.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |